Bathroom remodel: costs and free quotes
Full remodels, tub-to-shower conversions and refreshes. What it costs, what changes the price and how to compare quotes.
$9,000 to $30,000
Typical full remodel of a standard bathroom.
Bathrooms cost more per square foot than any other room because every trade works in a small space: plumbing, electrical, tile, ventilation and waterproofing. Moving a drain or a toilet is the single biggest multiplier, so the cheapest remodel keeps fixtures where they are.
Allowances are where bathroom quotes diverge. One contractor may allow $4 per square foot for tile and another $12. Ask for the allowance on tile, vanity, fixtures and glass, and compare those before you compare totals.
What bathroom remodel costs
| Job | Typical range | Notes |
|---|---|---|
| Full remodel | $9,000 to $30,000 | Standard full bath |
| Tub-to-shower conversion | $3,500 to $12,000 | Prefabricated to custom tile |
| Fixtures and finishes refresh | $2,500 to $8,000 | Vanity, toilet, lighting, paint |
| Accessibility updates | $2,000 to $12,000 | Grab bars to a curbless shower |
Typical U.S. installed prices compiled from published 2026 cost guides. Regional prices differ.
What moves the price
- Moving plumbing
- Tile quantity and grade
- Custom glass and cabinetry
- Waterproofing method
- Hidden water damage
Compare quotes on these points
- Material allowances line by line
- Waterproofing system named in the quote
- Who pulls permits
- Payment schedule tied to milestones
- Start date and expected duration
Questions to ask every provider
- What waterproofing system do you use behind the tile?
- What is the allowance for tile and fixtures?
- How do you handle surprises behind the wall?
- Can I see a recently finished bathroom?
Get bathroom remodel quotes
Free, with no obligation. You will see a ballpark range before you share any contact details.
- Project
- Details
- Timing
- Contact
- Free to use
- No obligation to hire
- Phone number optional
- We do not sell contact lists
Questions people ask
How long does a bathroom remodel take?
Two to five weeks for a full remodel once work starts, longer when custom glass or cabinetry is on order.
What adds the most cost?
Relocating plumbing, custom tile work and discovering water damage once the walls are open.
How much should I pay up front?
Keep deposits small and tie payments to completed stages. Some states cap deposits. California limits them to 10% of the price or $1,000, whichever is less.